Escalib Mills_GB

8 E s C A L I B M I L L s M D s : s I T E s P I R A L s T A I R C A s E W I T H s I D E E X I T EsCALIB MILLs MDs Lifting and moving (no more than 8 modules stacked) ... > 1 - Reposition the guardrails to close any side exits. Check that the M24 screws are tight in place.Attach the crane hooks to the 2 lifting rings. Detach the anchors. > 2 - Move the Escalib. Pivot the Escalib according to the height of the level which needs to be accessed with 90° rotations; Install 8 cm away from the wall. N.B.: Check that the ground on which the Escalib Mills is to be erected is able to withstand the load. REQUIREMENTS: > Fit new anchorages as new modules are added. >The dismantle must be done in the reverse order of assembly. N.B.: Comply with the general rules for handling and stability. > 3 - Position on the ground and level the Escalib. > 4 - Anchor the Escalib Mills before removing the slings from the crane. > 5 - At the access levels, the guardrails are positioned so as to privilege access by the main face A (face names shown on the sticker). > 6 - Check that the stair tower has been anchored before unhooking the slings. Guardrails must be swung out of the way to allow access to the required level. 30° maxi. A gain of productivity and safety : the Escalib can be easily and safely moved from on place to another and is used to create access to various slab levels with minimal effort .

RkJQdWJsaXNoZXIy OTQ2MzM=