Touréchaf
Compatibility with scaffolding... > Using a safe erection guardrail for safe assembly of standard formwork: - Guardrails must be fitted around the outside beforehand. - and the Touréchaf shoring is fitted with decks at the top. > 1 - Fit 3.50 m high standards with 0.35 m ledgers for the overhang. > 2 - Fit safe erection guardrails from the deck. Fix the guardrails using led- gers. > 3 - Next to the access to a small area, fit the main beams. joists and plywood from the Touréchaf deck. Continue fitting joists over the whole area of the formwork. > 4 - From the panels already laid, collect the first pack of plywood and lay the plywood over the joists up to the guardrail.There should be no more than 25 cm between beams. > 5 - Fit the final site guardrails fixed to the joists. > 6 - To remove, place the guardrails on the edge of the slab. Remove the shoring while standing on the deck of the towers by unscrewing the adjustable heads. Remove the guardrails at the edge of the formwork, the safe erection guardrail still being in place. The formwork components should be lowered to the ground or placed on the slab from the edge of the deck. The towers should be dismantled according to the instructions. 22 TOURéCHAF T O U R é C H A F : S H O R I N G T O W E R W I T H I N T E G R A L S A F E T Y S Y S T E M
Made with FlippingBook
RkJQdWJsaXNoZXIy OTQ2MzM=