EsCALIB MILLs MDs E s C A L I B M I L L s M D s : s I T E s P I R A L s T A I R C A s E W I T H s I D E E X I T 17 T he Escalib Mills can be suspended. Cantilevered out on H-beams, the modules are assembled then positioned by crane to quickly provide access to an excavation. > 1 - on the installed module, place the erection guardrail in the horizontal position and remove the barrier gate. Add a new module already fitted with a barrier gate and UPN beams. Erection of an Escalib Mills designed for an excavation. > 2 - Assemble the modules and swing the erection guardrail to the vertical position. Take up the slack on the crane slings. Remove the anchors and the two-UPN beams supported on the H-beam. > 3 - Lower the Escalib Mills until the 2 new UPN beams are resting on the H-beams. Fasten the anchors. Anchored H-BEAMS Escalib Mills Gangway UPN Beam bolted to the Escalib Mills Sketch of a suspended Escalib Mills for accessing an excavation. UPN Beam bolted to the Escalib Mills